// SITE INTELLIGENCE SUITE V1.0

Diagnostic Toolkit

Ten tactical diagnostic tools built to automate complex project management audits. Calculated locally, no signups, zero cost. Protect your margins through data visibility.

10 Active Modules
₹0 Access Cost
Local Data Privacy
CNSTRCT-T01
Budget Overrun

Risk probability and expected cost bleed metrics.

● ONLINE
CNSTRCT-T02
Safety Incident

Full financial breakdown of site accidents.

● ONLINE
CNSTRCT-T03
Material Waste

Efficiency benchmarks vs industry actuals.

● ONLINE
CNSTRCT-T04
Fatigue Index

Heat index impact on trade productivity.

● ONLINE
CNSTRCT-T05
Project ROI

Break-even and margin sensitivity analysis.

● ONLINE
ORACLE MODULE // FINANCIAL
Budget
Overrun Risk

Indian construction projects overrun by 20-40% on average. Input your project parameters to identify your specific exposure.

// OUTPUT TELEMETRY
> Overrun probability (%)
> Expected cost bleed (₹)
> Top 3 risk factors ranked
> Mitigation action plan
ORACLE ENGINE ACTIVEID: T01
[ STANDBY: DATA_ENTRY_REQUIRED ]
SENTINEL MODULE // SAFETY
Safety
Incident Cost

Safety incidents cost 4-10x more than just the compensation. This engine tracks the "iceberg" of indirect costs.

// OUTPUT TELEMETRY
> Direct vs Indirect breakdown
> Site shutdown impact
> Regulatory legal exposure
> Insurance impact
SENTINEL ENGINE ACTIVEID: T02
[ AWAITING_INCIDENT_PARAMS ]
ECO MODULE // EFFICIENCY
Material Waste
Estimator

Compare your consumption actuals vs global benchmarks to reveal recoverable capital from scrap and shrinkage.

// OUTPUT TELEMETRY
> Recoverable capital (₹)
> Benchmark variance (%)
> Material-wise breakdown
> Eco recovery score
ECO ENGINE ACTIVEID: T03
BIO MODULE // ERGONOMIC
Workforce
Fatigue Index

Temperature and humidity aren't just weather—they are productivity killers. Calculate the output bleed.

// OUTPUT TELEMETRY
> Productivity retained (%)
> Daily output loss (₹)
> Safe work window (hrs)
> Medical risk rating
BIO ENGINE ACTIVEID: T04
ORACLE MODULE // DEVELOPER
Project
ROI Calculator

Know your real gross development margin. Audit the sensitivity of your profits to construction delays.

// OUTPUT TELEMETRY
> Break-even per sqft
> Delayed scenario ROI
> Overrun impact on margin
> Financing cost audit
ORACLE ROI ENGINE ACTIVEID: T05
ORACLE MODULE // OPERATIONS
Delay Cascade
Estimator

A 10-day delay in structure isn't 10 days. It's a cascade. Calculate the downstream financial damage.

// OUTPUT TELEMETRY
> Total cascade days
> Finance cost addition
> Penalty clause exposure
> Recovery playbook
CASCADE ENGINE ACTIVEID: T06
LOGISTICS MODULE // VENDOR
Contractor
Performance Scorer

Remove gut-feel from renewals. Score contractors across 5 critical dimensions with weighted analytics.

// OUTPUT TELEMETRY
> Performance score /100
> Rework exposure (₹)
> Renewal recommendation
> Risk flag summary
VENDOR SCORING ENGINEID: T07
LOGISTICS MODULE // ASSET
Equipment
Utilisation Audit

Idle machines are cash burn events. Calculate the rent vs own break-even for your heavy assets.

// OUTPUT TELEMETRY
> Daily idle cost (₹)
> Rent vs Own break-even
> Monthly utility loss
> Deployment target
ASSET AUDIT ENGINEID: T08
ECO MODULE // COMPLIANCE
Green
Compliance Checker

Score your project across IGBC/GRIHA dimensions. Identify the gaps to official certification.

// OUTPUT TELEMETRY
> Estimated IGBC score
> Certification band
> Priority action gaps
> Compliance cost estimate
COMPLIANCE ENGINE ACTIVEID: T09
BIO MODULE // PLANNING
Workforce
Sizing Tool

Audit your labor requirements. Calculate trade-wise headcount and monthly wage burn projections.

// OUTPUT TELEMETRY
> Peak workforce count
> Monthly wage burn (₹)
> Trade-wise breakdown
> Staffing curve audit
SQUAD SIZING ENGINEID: T10