Construction has a "Reality Gap." What is on the blueprint is rarely what gets built. We close that gap by overlaying the 3D BIM model directly onto the physical site.
HVAC duct hits a beam. Work stops for 3 days. Rework costs ₹5 Lakhs.
System flags the clash in the virtual model 2 weeks early. Design updated instantly. Cost: ₹0.